Production: stage board and shop floor view
- Type
- Help center
- Updated
- Reading time
- 2 min
- Sections
- 5
On this page (5)
Production is your shop board: every order is a card that moves stage by stage, from “Pending” to “Installed / delivered.” In Zeder Studio, the office uses it to watch due dates and the shop uses it to move orders from a phone.
Create an order
Two ways:
- By hand: Production → New order. Fill in Order description, customer, project, Due date, Priority (Low, Normal, High, Urgent), Assignee and notes, then Create order.
- From an accepted quote: click Send to production on the quote. Only accepted versions qualify, and each version gets one order (see sending a quote).
Three views
| View | Best for |
|---|---|
| Board | Columns by stage; drag a card to the next column. |
| List | All orders in a table, to review due dates and assignees. |
| Shop floor | Big buttons for a phone or tablet in the shop: tap an order to move its stage or leave a note. |
Filter by search (“Search order, customer…”), assignee, priority, stage and status (In progress, Done, Canceled), or use the Overdue and Next 3 days shortcuts.
Stages
Every new shop starts with these stages (shown in your workshop’s language):
Pending → Materials preparation → Cutting → Edge banding → CNC / machining → Assembly → Finishing → Quality inspection → Ready for installation → Installed / delivered (done).
No CNC? Plenty of sheet-goods shops cut on a panel saw; just archive that stage. Under Production → Stages, the owner or an admin can rename, reorder (Up / Down), recolor, Archive or Restore, Add stage, and choose which stage counts as Done. Rules:
- Keep at least one active stage marked Done.
- You can’t archive a stage with open orders: move them first.
- Every stage needs a name, and names can’t repeat.
Moving an order into a Done stage completes it. Move it back to a regular stage and it reopens.
Order detail
- Frozen spec: the quote’s line items, copied when the order was created; it doesn’t change if the quote does.
- Timeline: created, moved, assigned, notes, completed, reopened, canceled.
- Notes for the team via Add note.
- Files: Upload file takes PDF, images, DXF and Excel up to 15 MB.
- QR label: print it and stick it on the parts; scanning it in the shop opens the order in the shop-floor view.
Mark done moves the order to the done stage.
Cancel order cancels it and releases reserved material.
Reopen puts a canceled order back in the first open stage.
Who can move what
The Workshop role lands straight on the shop-floor view: it can advance orders and leave notes but not edit them. Members, admins and the owner create, cancel and reopen orders. See team and roles.
Save this, optimize the cut list and quote it in Zeder Studio.
Frequently asked questions
Can I drop the CNC stage if I cut on a panel saw?
Yes. Archive it under Production → Stages, as long as it has no open orders.
What happens if I change the quote after creating the order?
Nothing changes on the order: it keeps a frozen spec of the quote’s line items from when it was created.
Keep reading
Inventory: movements and reservations
Record receipts, usage and count adjustments, set reorder points and reserve material for production orders.
Send a quote and get it accepted
Send and freeze a version, share the PDF or the online link so the customer can accept, create new versions and release it to production.
Team, roles and permissions
How to invite members, what each role can do (owner, admin, member, viewer, workshop) and how to hide costs and prices from someone.
Production
See every order's stage from cutting to install. A drag-and-drop board, a touch view for the shop floor, late jobs flagged and your own stages.
Small woodworking shops
Optimize cuts, quote and track jobs from your phone or computer. Start free and pay only for the module you use.
Cut better starting with your next job
Create an account and use the full Workshop plan for 14 days. No card; afterwards you drop to the Free plan, not a lockout.