Skip to content

Production: stage board and shop floor view

Create orders by hand or from an accepted quote, move them through stages, customize stages and use the shop floor view with QR labels.
Type
Help center
Updated
Reading time
2 min
Sections
5
On this page (5)

Production is your shop board: every order is a card that moves stage by stage, from “Pending” to “Installed / delivered.” In Zeder Studio, the office uses it to watch due dates and the shop uses it to move orders from a phone.

Create an order

Two ways:

  • By hand: Production → New order. Fill in Order description, customer, project, Due date, Priority (Low, Normal, High, Urgent), Assignee and notes, then Create order.
  • From an accepted quote: click Send to production on the quote. Only accepted versions qualify, and each version gets one order (see sending a quote).

Three views

ViewBest for
BoardColumns by stage; drag a card to the next column.
ListAll orders in a table, to review due dates and assignees.
Shop floorBig buttons for a phone or tablet in the shop: tap an order to move its stage or leave a note.
PendingCuttingAssemblyInstalled
Board view (simplified): the last column is the stage marked as Done.

Filter by search (“Search order, customer…”), assignee, priority, stage and status (In progress, Done, Canceled), or use the Overdue and Next 3 days shortcuts.

Stages

Every new shop starts with these stages (shown in your workshop’s language):

Pending → Materials preparation → Cutting → Edge banding → CNC / machining → Assembly → Finishing → Quality inspection → Ready for installation → Installed / delivered (done).

No CNC? Plenty of sheet-goods shops cut on a panel saw; just archive that stage. Under Production → Stages, the owner or an admin can rename, reorder (Up / Down), recolor, Archive or Restore, Add stage, and choose which stage counts as Done. Rules:

  • Keep at least one active stage marked Done.
  • You can’t archive a stage with open orders: move them first.
  • Every stage needs a name, and names can’t repeat.

Moving an order into a Done stage completes it. Move it back to a regular stage and it reopens.

Order detail

  • Frozen spec: the quote’s line items, copied when the order was created; it doesn’t change if the quote does.
  • Timeline: created, moved, assigned, notes, completed, reopened, canceled.
  • Notes for the team via Add note.
  • Files: Upload file takes PDF, images, DXF and Excel up to 15 MB.
  • QR label: print it and stick it on the parts; scanning it in the shop opens the order in the shop-floor view.
  1. Mark done moves the order to the done stage.

  2. Cancel order cancels it and releases reserved material.

  3. Reopen puts a canceled order back in the first open stage.

Who can move what

The Workshop role lands straight on the shop-floor view: it can advance orders and leave notes but not edit them. Members, admins and the owner create, cancel and reopen orders. See team and roles.

Save this, optimize the cut list and quote it in Zeder Studio.

Frequently asked questions

Can I drop the CNC stage if I cut on a panel saw?

Yes. Archive it under Production → Stages, as long as it has no open orders.

What happens if I change the quote after creating the order?

Nothing changes on the order: it keeps a frozen spec of the quote’s line items from when it was created.

Cut better starting with your next job

Create an account and use the full Workshop plan for 14 days. No card; afterwards you drop to the Free plan, not a lockout.