Edge banding calculator: meters and rolls to buy
Trimmed off at the ends
Result
- Edges to band
- 28
- Net meters
- 16.03 m
- Meters to buy
- 18.6 m
- Rolls
- 1
Save this, optimize the cut list and quote it in Zeder Studio.
On this page (5)
Edge banding is bought by the foot or by the roll, and it’s usually eyeballed. This calculator does it part by part, edge by edge, and adds what gets lost at the ends and in the edgebander.
How the calculation works
Edges = Σ qty × (long edges + short edges)
Meters to buy = (net + edges × allowance ÷ 1000) × (1 + waste % ÷ 100)
Rolls = round up (meters to buy ÷ roll length)
Long edges use the part’s Length and short edges its Width, 0 to 2 of each. The allowance is the overhang trimmed off at each end, added once per banded edge. Waste covers bander start-up, damaged runs and roll ends. Inputs are in millimeters and meters (1 m ≈ 3.28 ft).
Worked example
With the calculator’s defaults: 30 mm (about 1 3/16") allowance, 10% waste and a 50 m (164 ft) roll.
| Part | Size (mm) | Qty | Banded edges | Net (mm) | Edges |
|---|---|---|---|---|---|
| Side | 720 × 560 | 4 | 1 long | 4 × 720 = 2,880 | 4 |
| Shelf | 700 × 396 | 6 | 2 long + 2 short | 6 × 2,192 = 13,152 | 24 |
| Total | 16,032 | 28 | |||
(16,032 + 840) × 1.10 = 18,559 mm
Meters to buy: 18.6 m (about 61 ft) → 1 roll of 50 m
16.03 net meters (52.6 ft) become 18.6 real meters: almost 16% more. That’s the cushion most bids forget.
Which edges get banding on a typical box
Every shop has its own rules, but on frameless melamine cabinets it usually looks like this:
- Sides: the front edge; the back edge only if it shows.
- Top and bottom: the front edge.
- Shelves: the front, or all four edges on open shelving that shows from every side.
- Doors and drawer fronts: all four edges, usually with thicker banding.
- Backs and hidden parts: none.
Common mistakes
- Banding everything. Edges against a wall or hidden inside another cabinet usually don’t need it. Band only what shows.
- Mixing band types. Thin interior banding and thick banding for doors and fronts are separate purchases: calculate each one separately.
- Ignoring allowance on small parts. On a 4" part, 1 3/16" of overhang is almost a third more.
- Guessing roll length. It depends on the supplier, the width and the thickness; check with yours.
- Not deducting banding from the cut size. With thick banding the part grows. The app has Deduct edge band from cut size (see optimization settings).
Tips
- Set the allowance to your method: an automatic edgebander usually needs less than hand-applied, iron-on banding.
- Record the result per job and compare it with what you actually used; after three or four jobs you’ll know your real waste.
- To choose type and thickness (PVC, ABS, melamine, wood veneer), read edge banding types and how to calculate it.
- Carry the meters into your bid as an edge banding line with its waste in the Quote module, and set your price with the margin calculator.
Need the sheets too? Use the sheet calculator with the same cut list, so the banding and the sheet goods on your bid come from the same parts and quantities.
Related
Edge banding types and how to calculate it
PVC, ABS, melamine and wood veneer banding: thicknesses, widths, when to use each and how to calculate meters per part and per kitchen.
Sheet calculator
Work out how many melamine, MDF or plywood sheets you need from your parts, edge trim and waste percentage.
How to quote kitchen cabinets
How to price a kitchen cabinet job: measure, build the cut list, cost sheets, edge banding, hardware and labor, then set your price. With a worked example.
Optimization settings
What each optimizer setting does: blade kerf, edge trim, saw or CNC mode, cutting stages, objective, part rotation, offcuts first and banding.
Markup vs. margin
Price a job from its cost with markup or margin and see both side by side. Stop underpricing your quotes.
Quoting
Quote from real sheet, edge band, hardware and labor costs. Markup or margin, taxes, deposits, a branded PDF and online acceptance.
Frequently asked questions
How do I calculate edge banding for a cabinet?
For each part, add up the banded edges, multiply by the quantity, then add an allowance per edge and a waste percentage. The calculator does it for you.
How much allowance should I leave per edge?
It depends on how you band. The calculator starts at 30 mm (about 1 3/16 in) per edge; adjust it to what you actually trim off.
How long is a roll of edge banding?
It varies by supplier, width and thickness. Check the length with your distributor and enter it as the roll length.
Cut better starting with your next job
Create an account and use the full Workshop plan for 14 days. No card; afterwards you drop to the Free plan, not a lockout.