Skip to content

Read the cutting plan and save offcuts

How to read the plan's metrics (sheets, yield, cuts), page through each sheet, handle parts that don't fit and save or use offcuts.
Type
Help center
Updated
Reading time
3 min
Sections
6
On this page (6)

With parts and sheets in place, it’s time to optimize. Here’s how to run it, what each metric in the plan means, what to do when a part doesn’t fit, and how to save the job and its offcuts for the next one.

Optimize

  1. Click Optimize at the top right. The button is disabled if there are no parts or sheets, if you’re over your plan’s limit, or if “Some parts have no sheet assigned.”

  2. You’ll see “Optimizing… N%” with a progress bar. The math runs in your browser, so your list doesn’t leave your computer to be optimized. If it’s taking longer than you’d like, Cancel stops it.

  3. When it’s done, the Optimized layout shows up on the right (or below, on small screens).

The plan’s metrics

Boards

6

Yield

84.2%

Waste

15.8%

Parts placed

58/58

The metrics above the diagram (example values).
MetricWhat it tells you
BoardsHow many sheets (and offcuts, if used) the plan needs.
YieldShare of the material that ends up as parts.
WasteThe opposite: what doesn’t become a part.
Parts placedPlaced vs. total. If they don’t match, read the red warning.
CutsNumber of saw passes.
Cut lengthTotal length of all cuts; useful for blade wear and time estimates.
Reusable offcutsLeftovers big enough to keep.
Estimated costSheet cost, if sheets have a cost in the catalog and your user sees amounts. A “+” means some sheet is missing a price.
Approx. saw timeShown instead of cost when there’s no cost to show.

At the bottom is the plan’s Signature, a code for that exact layout: if two people see the same signature, they’re looking at the same plan. To read the waste figure correctly, see how to calculate waste.

Page through the boards

The diagram shows one board at a time, “Board 1 of 6,” with Previous and Next arrows and thumbnails to jump anywhere. The top right shows that board’s material and waste; boards that are offcuts carry an offcut tag.

Parts that don’t fit

If something couldn’t be placed, you’ll see “N parts do not fit on any available board.” with the reason and part names:

  • larger than the board: the part (plus trim) exceeds the sheet. Check the size, the grain or the trim.
  • no boards available: you ran out of sheets or offcuts available for that material.
  • material has no board: that material has no sheet size.

If you see “The search was cut short for time; the layout is valid and complete,” the plan is good to use as is; an Extensive search may do a little better.

Save the job

Use Save. The tag next to the name reads Unsaved changes or Saved, and your browser warns you if you try to leave with pending changes. The plan is saved with the cut list only if it’s current; in the Jobs list the status reads Optimized or, if you saved without a current plan, Draft. The Free plan holds 3 saved cut lists; the list shows “N of 3 saved.”

Offcuts: save and reuse

With the Cut plan (or Workshop and Full suite), good leftovers become stock:

  1. After optimizing, click Save N offcuts in the outputs panel. You need a current plan.

  2. On the next job, turn on Use offcuts first under Settings. Boards cut from offcuts are tagged offcut in the diagram.

  3. When you cut that plan, click Mark N offcuts as used to take them out of stock.

Cut’s Offcuts tab lists material, size, thickness, qty, location, status and source (the job it came from). Edit the quantity and location (say, “rack 2”) and change the status: Available, Reserved, Used or Scrapped. Scrap takes one out of circulation, and a quantity of 0 sets it to Used. The filter toggles between Available only and Show all.

Save this, optimize the cut list and quote it in Zeder Studio.

Frequently asked questions

Is my list uploaded to a server to optimize it?

No. Optimization runs in your browser. When you save, the cut list and plan are stored in your account.

Why don’t I see the estimated cost?

It only shows when the sheets have a cost in the catalog and your user has “Sees amounts.”

Cut better starting with your next job

Create an account and use the full Workshop plan for 14 days. No card; afterwards you drop to the Free plan, not a lockout.