Skip to content

Quotes: line items, markup or margin and tax

Build a quote with lines and sections, choose markup or margin, add waste, overhead, discounts, taxes and payment milestones.
Type
Help center
Updated
Reading time
3 min
Sections
7
On this page (7)

Quotes is where you price a kitchen, closet or built-in from your real costs: line items, waste, overhead, discounts, taxes and a payment schedule. Zeder Studio shows profit and margin as you type and warns you when the price doesn’t pay.

Create a quote

  1. Go to Quotes → New quote.

  2. Enter a Title and optionally pick a Customer and Project.

  3. Click Create quote. Each quote gets a sequential number: COT-0001, COT-0002…

Depending on where it comes from, a quote starts empty or pre-filled:

SourceWhat it brings
From scratchNo lines.
Design revisionSheets, edge banding and hardware from the cut list (see sending a design).
Cut planThe actual sheets the plan used, plus edge band meters.

Line items and sections

Add line adds a row; Add section groups rows (say “Base cabinets,” “Wall cabinets,” “Install”). Each line has a Type, Description, Qty, Unit and Unit cost.

TypesUnits
Sheet, Edge band, Hardware, Labor, Installation, Delivery, Otherpc, sheet, m, m², h, lot, trip

Per line you can also set a Rate (a different markup or margin just for that row), tick Fixed price (skips the markup), override Waste, or apply a Disc.

Markup or margin

Under How you price pick one formula. The app shows what it equals in the other.

Markup: price = cost × (1 + %)
Gross margin: price = cost ÷ (1 − %)

Example on a $1,000 cost (illustrative numbers):

30% markup: 1,000 × 1.30 = $1,300 → actual margin 300 ÷ 1,300 = 23.1%
30% margin: 1,000 ÷ 0.70 = $1,428.57 → same as a 42.9% markup
Cost$1,00030% markup$1,30030% margin$1,429
The same 30% gives different prices depending on the formula.

New quotes start at a 50% markup; set it to whatever your shop runs. Margin is capped at 99%. To play with the numbers, try the margin calculator.

Overhead and waste

Overhead spreads rent, utilities or fixed salaries across lines by cost share, before the markup is applied. Options: No overhead, % of direct cost, % of labor or Fixed amount.

Sheet & edge band waste % (10% by default) is added to the cost of Sheet and Edge band lines; the quantity the customer sees doesn’t change. Sheet counts that come from a design or a cut plan already include waste.

Discounts, taxes and payments

  • Discounts at three levels: per line, per section and overall (Discount % and/or Fixed discount).
  • Taxes come from Settings → Organization (for example sales tax, or IVA 16% in Mexico) and apply to the taxable base after discounts.
  • Payments default to Deposit 50%, Before installation 40% and On completion 10%. Edit them or use Add payment; they must add up to 100%.

Validity, terms and notes

Validity (days) and Terms and conditions come from your settings and can be changed per quote. Use Notes for the customer for anything that isn’t price: colors, lead times, exclusions.

Summary and warnings

The Summary shows Direct cost, Total cost (with overhead), Subtotal, Taxable base, Profit and Gross margin. Below a 25% margin you’ll see “Low margin: check costs or price”; with negative profit, “You lose money at this price.”

When it’s ready, send it: send a quote.

Save this, optimize the cut list and quote it in Zeder Studio.

Frequently asked questions

Should I use markup or margin?

They describe the same profit on different bases: markup is measured on cost, margin on price. Use whichever your shop uses; the app shows the equivalent.

Why don’t I see sales tax?

Taxes come from Settings → Organization. If none is enabled, the quote says “No taxes configured in Settings.”

Cut better starting with your next job

Create an account and use the full Workshop plan for 14 days. No card; afterwards you drop to the Free plan, not a lockout.